Pricing

S-curve growth model slides

S-curve growth slides show the shape almost every kind of growth follows: a slow start, a steep climb once things catch on, and a flattening as the market fills. Pick one of 8 layouts, brand it to your company in one click, mark where you are, and export to PowerPoint, Google Slides, or Keynote.

Free to start. No credit card required.

S-curve growth model slides in the Choladeck slide library

Browse S-curve slides

8 ways to show where you sit on the curve, all fully editable.

S-Curve Model • Slide Library • Layout 01 of 8

S-curve growth model slide, layout 01
S-curve growth model slide, layout 01

Layout 01

S-curve growth model slide, layout 02

Layout 02

S-curve growth model slide, layout 03

Layout 03

S-curve growth model slide, layout 04

Layout 04

S-curve growth model slide, layout 05

Layout 05

S-curve growth model slide, layout 06

Layout 06

S-curve growth model slide, layout 07

Layout 07

S-curve growth model slide, layout 08

Layout 08

About our S-curve slides

What the slide does, how to use it, your brand, and a file you can edit anywhere.

Built to show where you are on the curve and what comes next

Products, technologies, markets, and companies all tend to grow along an S-shape. Knowing where you sit on the curve changes what you should do next: invest to push through the slow start, scale fast during the climb, or look for the next curve before the plateau. S-curve growth slides make that position visible, so strategy discussions start from the same picture.

Why the plateau is the real warning sign

Growth that’s slowing can look healthy for a long time, because the numbers are still going up. The S-curve shows that the flattening is the start of the end of that curve. So the slide becomes the case for starting the next thing while the current one still has momentum.

Brand the whole presentation in one click

Add your logo, colors, fonts, and background once. It applies to the whole presentation and the entire slide library at the same time. S-curve slides go into strategy and innovation presentations for leadership and investors, so once branded, they match the rest of your story.

Export to PowerPoint, Google Slides, or Keynote

You get a real file, not a locked link. Export it and keep editing in the tool you already use. The curve, labels, and markers stay editable, so you can move your position as growth changes.

How Choladeck works

From blank page to finished presentation in four steps.

STEP 01

Browse 9,000+ slides across 134+ categories, or open one of the 74 premade presentations.

STEP 02

Add your logo, colors, and fonts in one click. The whole presentation instantly matches your company.

STEP 03

Add your text, numbers, charts, and tables. Everything on the slide is editable.

STEP 04

Send it to PowerPoint, Google Slides, or Keynote, and present.

Start from a template

Need a complete presentation instead?

If you're starting from nothing rather than fixing a few slides, open one of 74+ premade presentations instead. Each one is complete and built for one purpose, from pitch decks to business plans and company profiles.

Choladeck premade templates with the Type of Presentation filter and the Consulting Company Profile deck shown larger

Questions about S-curve slides

How the slides work, and how far you can change them.

Using the slides

Can I edit these slides in PowerPoint?

+

Yes. Export to PowerPoint, Google Slides, or Keynote, and the curve, every label, and every marker stay editable. Nothing is locked and nothing is a flat image.

How do I brand them to my company?

+

Add your logo, colors, fonts, and background once. It applies to the whole presentation and the entire slide library at the same time.

Can I mix them with other slides from the library?

+

Yes. Add an S-curve slide to any premade template, or pair it with product life cycle or Rogers' five factors slides from the library. Branding applies across all of them.

About the S-curve

What are the stages of an S-curve?

+

A slow start, rapid growth, then maturity where growth levels off. Some versions show a decline after the plateau.

What does jumping to the next S-curve mean?

+

Starting a new product or business while the current one is still growing, so the new curve takes off before the old one flattens.

How is it different from the product life cycle?

+

The product life cycle follows one product into decline. The S-curve focuses on growth and when it slows, so it's often used to plan what comes next.

Your next S-curve slide is already designed

Pick a layout, brand it in one click, add your content, and export.

Free to start. No credit card required.